Odoo Manufacturing

Facilitate your shop floor operations with Odoo Manufacturing, delivered and optimised by Taxonify, Odoo ERP Development Company in Dubai.

From Planning to Production

Managing manufacturing doesn’t have to be complicated. Taxonify’s implementation of the Odoo Manufacturing module makes your entire production process smoother, brighter, and fully connected.

This app is designed to put you in control of your factory floor, from creating bills of materials (BoMs) and managing work orders to automating planning and tracking operations in real time.

Whether running discrete, custom, or batch production, our Odoo solution supports lean manufacturing, MRP, quality checks, and maintenance, all from a single, integrated dashboard.

Everything You Need to Run a Smart Factory

Easily create and manage work orders with intelligent scheduling and real-time floor updates.

Build complex or straightforward multi-level BoMs. Reuse components across multiple products and set routing per BoM for maximum flexibility.

Using Odoo’s smart MRP engine, production and purchase operations are automatically scheduled based on demand forecasts, stock levels, and lead times.

Use barcodes to manage everything from picking and manufacturing orders to inventory adjustments and quality checks, and speed up every process.

Define custom routing steps for each product. Assign work centres, set durations, and track actual time spent per operation.

Collaborate on product changes with version control, BoM revisions, and engineering change orders (ECOs), which are ideal for product design and development teams.

Define quality control points. Trigger checks automatically during specific manufacturing steps. Log inspections and attach detailed reports.

Easily manage equipment maintenance. Schedule preventive tasks or respond to failures with corrective actions, all linked to the production environment.

Outsource specific operations or assemblies with built-in subcontracting workflows, material tracking, and invoicing.

Track every component, operation, and lot/serial number from procurement to final delivery, supporting full backwards and forward traceability.

Monitor work centre performance, production efficiency, downtime causes, and cost breakdowns using built-in reports and dashboards.

Directly link with Inventory, Purchase, Sales, Accounting, and PLM for a truly connected manufacturing ecosystem.

Build Better, Waste Less, Deliver Faster

End-to-End Visibility

Track performance, downtime, and bottlenecks in real time to see exactly what's happening on your production floor.

Faster Time to Market

Reduce lead times with optimised planning and streamlined operations.

Lean & Efficient

Avoid overproduction, reduce stock waste, and increase equipment efficiency (OEE).

Accurate Costing & Planning

Analyse production costs based on labour, materials, and overheads for better budgeting.

Adaptable for Any Industry

From custom manufacturing to mass production, the system adapts to your workflow and scales with growth.

Improve Product Quality

Integrated quality checks ensure consistent standards across every batch or unit.

Connected Work Environment

Keep your production, maintenance, quality, and inventory teams in sync, on one unified platform.

Partner with Taxonify, to implement a manufacturing system that’s innovative, scalable, and made for your business.

Our Expertise in Odoo Services

At Taxonify, we’re here to help make Odoo Erp work for you. Whether you’re just starting with Odoo or looking to improve your current setup, we’ve covered you with services designed to make your business run smoother and smarter.

Let's Get Started

Still have questions? Reach out to us today, and let’s discuss your Odoo manufacturing needs!